CN 2012 Pine Mountain Tanks Phase 2 Project

Description: This contract is for furnishing labor, equipment and materials for the design, construction and commissioning of two 90-foot inside diameter pre-stressed concrete treated potable water storage tanks, yard piping, control systems and final site grading.
Addendum 1 (click to expand/collapse)
Name Size
CN 2012 Addendum No. 1 6.8 MB
Addendum 2 (click to expand/collapse)
Name Size
CN 2012 Addendum No. 2 247.2 KB