CN 2012 Pine Mountain Tanks Phase 2 Project
Description: This contract is for furnishing labor, equipment and materials for the design, construction and commissioning of two 90-foot inside diameter pre-stressed concrete treated potable water storage tanks, yard piping, control systems and final site grading.
Addendum 1
(click to expand/collapse)

Name | Size | |||
CN 2012 Addendum No. 1 | 6.8 MB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
CN 2012 Addendum No. 2 | 247.2 KB |