CN 2012 Pine Mountain Tanks Phase 2 Project

Description: This contract is for furnishing labor, equipment and materials for the design, construction and commissioning of two 90-foot inside diameter pre-stressed concrete treated potable water storage tanks, yard piping, control systems and final site grading.
Plans for Viewing (click to expand/collapse)